The whole freeway surface on I-215 between the 201 and 4700 S is terrible. Big holes in the surface and uneven patches. People swerve to avoid holes, almost hitting each other. Also potentially damaging to cars and tires.
The whole freeway surface on I-215 between the 201 and 4700 S is terrible. Big holes in the surface and uneven patches. People swerve to avoid holes, almost hitting each other. Also potentially damaging to cars and tires.
4 Comentars
UDOT Administration (Oficial verificado)
Reconocido Agustin - UDOT Region 2 Communications (Usuario registrado)
Thanks for contacting us. There are several improvements planned on I-215. This year crews will repave the westbound lanes from 300 East to Redwood Road.
In addition, a major reconstruction of I-215 in both directions will begin in Spring 2016, from S.R. 201 to 4700 South. Crews will remove the existing pavement and install new, long-lasting concrete pavement.
There will also be new auxiliary lanes, minor interchange modifications and bridge reconstruction at various locations. This work is scheduled for completion in late 2017.
Finally, the I-215 bridge over S.R. 201 will undergo major reconstruction in 2017 as well. Crews will remove the upper portion of the bridge and replace it with a new structure.
For more information, contact the project team at 888-528-WORK, or i-215@utah.gov
South (Usuario registrado)
UDOT Administration (Oficial verificado)
This issue has been marked as a duplicate of issue 1872995.
If you are already receiving notifications regarding this issue,
you will now receive updates regarding issue 1872995.